
1.Make a hole of the right diameter and depth and clean it.

2.Place the expansion sleeve in the borehole

3.Place the tool in the sleeve and hit it with a hammer until it stops at the edge of the sleeve.

4.Screw the hook into the sleeve until you get clear resistance.

5.The attachment is ready to accept the load.


|
Item No. |
Ø Hole |
Wire Diameter |
Total Length |
Inner eye diameter |
Bag |
Carton |
|
mm |
mm |
mm |
mm |
pcs |
pcs |
|
|
EB M3/60/85 |
3 |
2.6±0.1 |
85+2 |
13±1 |
100 |
600 |
|
EB M4/55/80 |
4 |
3.5±0.1 |
80+2 |
15±1 |
100 |
600 |
|
EB M4/70/95 |
4 |
3.5±0.1 |
95+2 |
15±1 |
100 |
600 |
|
EB M5/70/100 |
5 |
4.4±0.1 |
100+2 |
15±1 |
100 |
600 |
|
EB M5/100/130 |
5 |
4.4±0.1 |
130+2 |
15±1 |
100 |
600 |
|
EB M6/50/80 |
6 |
5.2±0.1 |
80+2 |
15±1 |
100 |
600 |
|
EB M6/70/100 |
6 |
5.2±0.1 |
100+2 |
15±1 |
100 |
600 |
|
EB M6/95/130 |
6 |
5.2±0.1 |
130+2 |
15±1 |
100 |
600 |
|
EB M8/60/100 |
8 |
7.0±0.2 |
100+2 |
24±1 |
100 |
400 |
|
EB M8/70/110 |
8 |
7.0±0.2 |
110+2 |
24±1 |
100 |
400 |
|
EB M8/85/130 |
8 |
7.0±0.2 |
130+2 |
24±1 |
100 |
400 |
|
EB M8/105/150 |
8 |
7.0±0.2 |
150+2 |
24±1 |
100 |
400 |
|
EB M10/75/130 |
10 |
9.0±0.2 |
130+3 |
24±1 |
50 |
200 |
|
EB M12/80/135 |
12 |
10.7±0.3 |
135+3 |
24±2 |
50 |
100 |

|
Item No. |
Ø Hole |
Wire Diameter |
Working Length |
Inner eye diameter |
Bag |
Carton |
|
mm |
mm |
mm |
mm |
pcs |
pcs |
|
|
EB M10/100 |
10 |
10.0-0.3 |
100+3 |
23±2 |
100 |
100 |
|
EB M10/140 |
10 |
10.0-0.3 |
140+3 |
23±2 |
100 |
100 |
|
EB M10/160 |
10 |
10.0-0.3 |
160+3 |
23±2 |
100 |
100 |
|
EB M10/190 |
10 |
10.0-0.3 |
190+3 |
23±2 |
100 |
100 |
|
EB M10/230 |
10 |
10.0-0.3 |
230+3 |
23±2 |
100 |
100 |
|
EB M10/260 |
10 |
10.0-0.3 |
260+3 |
23±2 |
100 |
100 |
|
EB M12/90 |
12 |
12.0-0.3 |
90+5 |
23±2 |
100 |
100 |
|
EB M12/120 |
12 |
12.0-0.3 |
120+5 |
23±2 |
100 |
100 |
|
EB M12/160 |
12 |
12.0-0.3 |
160+5 |
23±2 |
100 |
100 |
|
EB M12/190 |
12 |
12.0-0.3 |
190+5 |
23±2 |
80 |
160 |
|
EB M12/230 |
12 |
12.0-0.3 |
230+5 |
23±2 |
80 |
160 |
|
EB M12/260 |
12 |
12.0-0.3 |
260+5 |
23±2 |
80 |
160 |
|
EB M12/300 |
12 |
12.0-0.3 |
300+5 |
23±2 |
50 |
100 |




Large stock and quick delivery than every competitor
Strong R&D team and strict QC system ensure the quality, Less than 0.3% product failure rate
Continuous Innovation and research and development, improve process, stabilize product quality and improve production efficiency